Hermetic Door Cleanroom Solutions with Full Certification

Frameshft supplies, installs, and maintains certified hermetic doors for cleanrooms and sterile environments in Singapore, maintaining precise air pressure differentials with STC35 sound insulation.

Why Standard Doors Fail in Cleanroom Environments

Cleanroom operations demand a level of environmental control that generic commercial door systems are not engineered to provide.

  1. 01

    Air pressure differential compromised at threshold

    Doors without airtight seals allow air exchange across the threshold, disrupting the pressure differential critical to cleanroom classification and contamination control.

  2. 02

    Non-compliant doors risk regulatory audit failure

    Cleanroom facilities without certified door systems face compliance exposure during third-party audits, threatening operational licences and production continuity.

  3. 03

    Post-installation vendor fragmentation

    Separate suppliers for supply, installation, and servicing create accountability gaps that leave facility managers without a single point of contact when issues arise.

Certified Hermetic Doors Built for Cleanrooms

Frameshft designs, supplies, installs, and maintains automatic hermetic doors certified to BS EN1026:2000 and BS EN12207:2016 for cleanroom and sterile environments. With door leaves up to 1,000kg, STC35 sound attenuation, and failsafe motor locking, every system is backed by in-house technical expertise and long-term maintenance support under one roof.

  1. 01

    Assess

  2. 02

    Specify

  3. 03

    Install

  4. 04

    Maintain

Door Systems Engineered for Sterile Environments

We select and configure the right combination of systems for your cleanroom environment, then support every installation with ongoing maintenance.

  1. Surgical team walking through an automatic hermetic door
    01 / 04Sterile Environment Control

    Airtight Hermetic Doors for Cleanroom Integrity

    Purpose-built for cleanrooms requiring strict air pressure differential control, Frameshft hermetic doors feature airtight sealed panel integration, flush anodised aluminium edging, and failsafe motor locking. Certified to BS EN1026:2000 and BS EN12207:2016 with CE and TÜV verification.

    Key Specifications

    01
    BS EN1026 and BS EN12207 certified
    02
    Failsafe motor lock on power interruption
    03
    STC35 sound insulation rating
  2. Automatic glass sliding doors at a commercial entrance with city skyline
    02 / 04High Traffic Access

    Automatic Sliding Doors for Cleanroom Corridors

    For cleanroom corridor access points where throughput and reliability matter, Frameshft automatic sliding doors provide touchless activation with 200 to 360kg capacity and full certification to DIN18650-1:2010 and EN16005 safety standards.

    Key Specifications

    01
    Up to 1,400mm/sec travel speed
    02
    DIN18650-1 and EN16005 certified
    03
    2,000,000-cycle endurance tested
  3. Technician servicing an automatic sliding door operator at a shopping mall entrance
    03 / 04Ongoing System Integrity

    Scheduled Maintenance for Cleanroom Door Systems

    In cleanroom environments, unplanned door failure is not an option. Frameshft preventive maintenance packages include scheduled inspections, wear-part checks, and sensor calibration to catch faults before they compromise your controlled environment.

    Key Specifications

    01
    Scheduled inspections and sensor calibration
    02
    Multi-brand door system coverage
    03
    OEM spare parts held in Singapore
  4. Modernised glass automatic entrance at a commercial building lobby
    04 / 04Compliance Upgrade

    Retrofit Aging Doors to Current Standards

    If your existing cleanroom door systems no longer meet current certification requirements, Frameshft retrofit and modernisation services upgrade operators and controllers to current performance and safety standards without requiring full frame reconstruction.

    Key Specifications

    01
    No full structural reconstruction required
    02
    Restores certification compliance
    03
    Extends operational system lifespan

Answers before you ask.

Procurement-level detail on certifications, multi-brand servicing, and post-handover accountability.

Get a Quote

Get a Quote for Your Cleanroom Door Project

Tell us about your cleanroom environment. Our in-house technical team will assess your requirements and provide a detailed proposal with full certification documentation.

Changi Airport · KKH · CGH · MINDEF · PMO · 100+ Singapore facilities